Piping Painting Systems

Field Paint System for structural, utility, piping, Equipment, Hydrocarbon Pumps, Hydrocarbon lines (For Temperature less than 90° C) (Un-insulated CS Lines):

  1. Surface Preparation  : SA-2 1/2
  2. Primer Coat : Inorganic Zinc Silicate Coating : DFT : 70 microns
  3. Intermediate Coat : Polyamide Cured High Build Epoxy Micaceous Iron Oxide Coat : DFT : 100 microns
  4. Final Coat : Acrylic Polyurethane Finish Paint :  Two Coats :  DFT 60 microns each.
  5. Total DFT : 230 Microns.

Painting System for Galvanised Pipe and Galvanised Surfaces.

  1. Surface Preparation :  ST.2
  2. Primer Coat  : Etch Primer : DFT : 8 microns
  3. Intermediate Coat : Zinc Phosphate Epoxy Primer : DFT  : 50 microns.
  4. Final Coat : Acrylic Polyurethane Finish Paint :  Two Coats :  DFT 40 microns each.
  5. Total DFT : 138 microns.